Wachusett Dam Piezometer project

Geosearch advanced multiple piezometers to depths of 100’ to 110’. Drilling was completed by angle drilling, drive and wash casing, air hammer and roller bit. Angel locations required drilling through the base of the dam. In order to keep the site clean all cuttings and water were diverted to a frac tank located onsite.​

Share by: